D-TE™ – installation on 75 blades in South America
A 2.0 MW wind turbine, commissioned in 2014 with 47.5 m blades, was experiencing a...
RES acquires Bladena to strengthen digital wind farm solutions through advanced blade engineering
London, 29 November 2024 – RES, the world’s largest independent renewables company, has acquired Danish wind...
CORTIR III: Blade measurement and model validation
As part of the CORTIR III project supported by the EUDP (Energy Technology Development and...
Hidden risks in wind turbine blades
Understanding the hidden risks in wind Turbine Blades At first glance, a crack in a...
- 1
- 2



