Resources

D-TE™ – restoring blade integrity for higher availability

Challenge A 5 MW wind turbine with 59.5 m blades, commissioned in 2013, was being...

D-String® enabling long-term performance with minimal repairs

A 1.5 MW wind turbine with 37 m blades, commissioned in 2007, had developed multiple...

D-TE™ – strengthening blades to withstand strong winds

A 0.9 MW wind turbine with 27 m blades, commissioned in 2012, was being curtailed...

D-String® + D-TE™ – custom solution to stop open trailing edge

A 1.5 MW wind turbine with 34 m blades, commissioned in 2003, was experiencing open...

D-TE™ – installation on 75 blades in South America

A 2.0 MW wind turbine, commissioned in 2014 with 47.5 m blades, was experiencing a...
RES acquires Bladena to strengthen digital wind farm solutions through advanced blade engineering

RES acquires Bladena to strengthen digital wind farm solutions through advanced blade engineering

London, 29 November 2024 – RES, the world’s largest independent renewables company, has acquired Danish wind...

CORTIR III: Blade measurement and model validation

As part of the CORTIR III project supported by the EUDP (Energy Technology Development and...
Hidden Risks in Wind Turbine Blades

Hidden risks in wind turbine blades

Understanding the hidden risks in wind Turbine Blades At first glance, a crack in a...